ÐÓ°É´«Ã½

Central Asia Energy News Digest Issue 9 (15 May 2019)

Central Asia Energy News Digest Issue 9

Date: 1-15 May 2019

Ìý

Kyrgyzstan

Energy Charter Treaty modernisation discussed in the Kyrgyz Republic

In English:

Import cuts of Kazakh gasoline expected to increase illicit trade

In Russian:

Number of the day: 3 billion KGS (US$ 43 mln.) spent by state companies on fuel and lubricants every year

In Russian:

Fee schedule for NESK (national electricity generation company) still under negotiation

In Russian:

85% of NESK debts owed by distribution utlities

In Russian:

National budget loses 5 billion KGS (US$ 71.5 mln.) annually as a result of smuggling of fuel and lubricants

In Russian:

Will Issyk Kul become radioactive?

In Russian:

Fire at an oil depot in Kyrgyzstan: 2 thousand people evacuated

In Russian:

Ìý

Uzbekistan

Uzbeks using alternative energy in their homes to get tax breaks

In Russian:

Uzbek Senate approves renewable energy law

In Russian:

President Mirziyoyev approves reorganization of Uzbekenergo

In Russian:

Uzbekneftegaz intends to select a contractor to upgrade the Bukhara refinery by the end of the year

In Russian:

Heads of Rosatom, Lukoil and SOCAR to visit Uzbekistan in mid-May

In Russian:

Italy's Eni may enter Uzbek market

In English:

Brick factory opposes switching to coal

In Russian:

Hyundai plans to start production of electric cars in Kokand

In Russian:

Tatneft will search for oil and gas fields in Uzbekistan

In Russian:

Indonesian RT Trans Asia Resources to invest over $ 875 million in the modernization of the Fergana refinery

In Russian:

Russia and Uzbekistan to sign a contract for the construction of a nuclear power plant by the end of 2019

In Russian:

Uzbekneftegaz may issue US$ 1 billion Eurobonds in mid-2020

In Russian:

Gas production at the Djel field is planned to begin in 2021

In Russian:

First oil obtained at Mingbulak field

In Russian:

Epsilon Development Company prepares to drill on Surkhan and Mubarek fields

In Russian:

Almost $ 900 million invested in Fergana and Altyaryk refineries

In Russian:

Ministry of Energy response to a Gazeta.uz article about greenhouses and coal

In Russian:

A new gas chemical complex will appear in Uzbekistan

In Russian:

LUKOIL boosts oil and gas production at the expense of projects in Uzbekistan

In Russian:

Ìý

Tajikistan

Tajikistan to supply cheap electricity to Pakistan

In Russian:

Reconstruction of the Kairakkum HPP will begin in 2020

In Russian:

National Savings Bank Amonatbank begins buying back Sangtuda shares

In Russian:

When the numbers do not match. Or how to save Barki Tojik from bankruptcy?

In Russian:

Tajikistan exports over 11 million kWh of electricity daily

In Russian:

Tajik section of CASA-1000 to be completed before the end of 2021

In Russian:

Ìý

Kazakhstan

Samruk-Energy’s profits exceed US$ 9 million

In English:

Chinese Risen Energy talks benefits of financing new SPP in Kazakhstan with EBRD

In English:

Kazakhstan to start producing fuel for nuclear power plants by the end of 2019

In Russian:

Digital platform on renewable energy presented to Nursultan Nazarbayev

In Russian:

Solar Fest Qazaqstan - festival of renewable energy workers to be held in Kazakhstan

In Russian:

Oil and gas field depletion observed in Kyzylorda Oblast

In Russian:

Ministry of Energy to select 255 MW of renewable energy projects for installation in 2019

In Russian:

Green energy saves more than 20 million tenge (US$ 52,000) per year in Nur-Sultan

In Russian:

Over 500 boiler houses to be repaired this year in Kazakhstan

In Russian:

President Tokayev: It is necessary to develop of new oil and gas fields

In Russian:

Buy to sell: Ekibastuz GRES-2 will be 100% Kazakh

In Russian:

Karachaganak to keep annual oil production at 10.5 million tons

In Russian:

Kazakhstan remains world leader in uranium mining - Energy Ministry

In Russian:

Ìý

Turkmenistan

Turkmenistan increases export potential of the domestic fuel and energy complex

In Russian:

Ìý

Other regional news

KazTransGas Resumed Transit of Turkmen Gas to Russia

In Russian:

Ìý

Analysis

Opinion: Technological disadvantages of renewable energy do not allow countries to completely abandon traditional and atomic energy sources

In Russian:

Infographic: capacity additions required in case of an annual load growth of 3% - 10% by 2021-2023

In Russian:

Infographic: - Kyrgyzstan’s energy reserves and electricity in numbers

In Russian:Ìý

Striking against coal: why companies are being cut off the gas supply (Uzbekistan)

In Russian:

Ìý

Ìý


Phone: +996 (312) 915000 ext. 326, 327

Email: tspc@auca.kg

Address: 7/6 Aaly Tokombaev Street, Bishkek, Kyrgyz Republic 720060

 

FAQ


ÐÓ°É´«Ã½
7/6 Aaly Tokombaev Street
Bishkek, Kyrgyz Republic 720060

Tel.: +996 (312) 915000 + Еxt.
Fax: +996 (312) 915 028

Ìý Ìý ÌýÌýÌýÌý Ìý